Thickness: | two.0mm, 3. 0mm, four.0mm |
width: | 1m |
Length | 10m |
The technical specs can be EPT by the buyers’ requirments. |
Merchandise Specification | |||||||
Brand quot STAR Power quot SBS fleXiHu (West Lake) Dis.ble modified asphalt waterproof membrane use SBS (styrene-butadiene-styrene) thermoplastic elastomer modified asphalt as dip-coating materials, , with large-good quality polyester felt, glass fiber felt, glass fiber reinforced polyester felt as base materials, making use of good sand, mineral pellets, PE film, aluminum film, and many others as launch liner, the SBS fleXiHu (West Lake) Dis.ble modified asphalt water-proof membrane agitated and ground by EPT EPT. |
|||||||
Features one) Protected, simple and rapidly installation, no naked flame, no binder, no air pollution. two) Outstanding adhesive overall performance, self-healed home. 3) Anti-puncture, anti-tension, very good eEPTation, anti-corrosion. four) Good fleXiHu (West Lake) Dis.bility unEPTlow temperature. 5) Widened membranes can reduce loss. |
|||||||
Application 1) EPT and civil building roofing, underground, pool, tunnel, picket and metallic roofing. two) EEPTly in the chemical manufacturing facility, XiHu (West Lake) Dis.Hu (West Lake) Dis.ment manufacturing facility, and granary. 3) EPTpe can be utilised for sealing all development substance four) Water-proof remedy of structural design joints, overlap sealing of polymer waterproof membrane. |
Storage and Transportation 1) Separate storage for different designs. two) Temperature must be underneath 40 ordmC. 3) Keep away from direct sunshine, rain, maintain ventilated. four) Do not piled horizontally, maintain stand vertically and not more than two flooring. |
|||||||
Building Approach: Step1: Ensure all floor are thoroughly clean,dry and dust-totally free. Remove any free particles and any rust with a wire brush amp gentle broom. Step2: Roll out the membrane. Step3: Peel again about 6 quot-twelve quot of the release liner and spot the adhesive side to the beforehand ready area. Step4: Proceed to peel back again the rlease liner as the rape is unrolled and push EPT into location over the base seam. Step5: Apply organization, uniform pressure with a hand roller to the complete surface area of the EPT, eEPTly at the overlaps. Step6: Smooth flat all edages with a wallpaper roller or trowel. Step7: Soon after use reseal pack and store uprigEPT in great,dry condition. |
Specification for EPT Bituminous Water-resistant Membrane: | |||||||
No. | Items | PE | PET | PYG | |||
PY | G | PY | G | ||||
1 | Solubale Compound, g/m sup2 ge | 3mm | 2100 | – | |||
4mm | 2900 | – | |||||
5mm | 3500 | ||||||
two | EPTermeability | Strain, Mpa ge | .3 | .two | .three | ||
Keep time, min ge | thirty | ||||||
three | Heat Resistance | ninety ordmC | a hundred and five ordmC | ||||
No flowing or dripping | |||||||
four | Nai Tear Resistance (N/50mm) ge | 500 | 350 | 800 | five hundred | 900 | |
5 | EEPTation Max. Tension,% ge | 30 | – | forty | – | – | |
6 | Low Temperature FleXiHu (West Lake) Dis.bility , ordmC | -20 | -20 ordmC | ||||
No cracks | |||||||
ten | Warmth Getting older | Tension Retention, ge | 80% | ||||
Low Temperation FleXiHu (West Lake) Dis.bility | -fifteen ordmC | -20 ordmC | |||||
Physical appearance | No slipping, flowing or dripping | ||||||
eleven | Govt StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd | GB18242-2008 |
Design Approach:
Step1: Make sure all surface are thoroughly clean,dry and dust-totally free. Remove any loose particles and any rust with a wire brush amp gentle broom.
Step2: Roll out the membrane.
Step3: Get rid of the backing paper and spot the adhesive side to the formerly geared up surface area.
Step4: To make certain a tigEPT speak to-smooth the EPT down with a dry cloth, remocing all the air bubbles
Step5: Press the EPT to the surface area firmly once in placement.
Step6: Clean flat all edages with a wallpaper roller or trowel.
Step7: After use reseal pack and keep uprigEPT in awesome,dry issue.
Storage and Transportation:
1) Package in plastic bag.
two) Independent storage for various versions.
three) Avoid immediate sunshine, rain, preserve ventilated.
four) Do not piled more than 5 flooring collectively if horizontal, one ground if stand.